AMIAR

Solutions

Smart metering for every network

From rural areas without cellular coverage to cities where PLC can't reach: the same technology, applied to each problem.

The pilot

100 meters vs. 4 kilometers

An example: a utility with 100,000 users decides to run a pilot with 5,000 meters. The range between devices defines what that pilot can demonstrate.

PLC or short-range meters

5 %

of the utility's area with a working Smart Grid.

  • The pilot is confined to a very small area
  • Conventional meters are still installed for new users and replacements
  • The benefits stay limited to an area too small to lower costs

AMIAR

100 %

of the area covered: five thousand diagnostic points spread across the network.

  • Remote disconnect and reconnect anywhere
  • Users who feed energy into the grid
  • Remote reading of hard-to-reach users
  • Faster repairs and preventive maintenance

How to start?

A pilot with a few devices, at the points where you'll save the most.

Tell us about your network

Urban, rural or mixed: we'll show you the platform running on a network similar to yours.