Short range
5 %The pilot stays in a limited area and isn't enough to change operations or lower costs.
Urban utilities
In the city, the alternative is PLC, with a range of 80 to 100 meters. AMIAR reaches 700 meters with the meter inside the meter cabinet.
This lets you install meters where they save the most—repeat late payers, hard-to-reach users, new connections—without grouping them under the same transformer.
The classic pain point
At a utility with thousands of users, the same group of customers gets disconnected again and again. The proposal: when the crew goes out to disconnect, it swaps the meter for an AMIAR one. The next time, disconnection and reconnection are done from the platform.
Pilot
A utility with 100,000 users piloting 5,000 meters can have a Smart Grid in 5% of its area… or in 100%.
The pilot stays in a limited area and isn't enough to change operations or lower costs.
Five thousand diagnostic points spread across the whole service area, with remote disconnect, reconnect and reading anywhere.
Tools
Peak, off-peak and shoulder for shops and industry.
See three-phase meterBidirectional metering for users who feed energy into the grid.
Voltage traffic light and power outage alerts on the map.
Connection to the utility's billing software.
Start with the users who cost you the most and add meters as you see results.